Desk-based
Energy Statement Checklist
Residential
Important information
Target for energy statement
This may be based on CO2 reduction or reduction of energy use. Knowing the target will allow us to ensure the property is meeting requirements or provide advice if it isn’t.
Preferred strategy
Knowing your preferred strategy for CO2 or energy use reduction before carrying out the energy statement saves time. We can apply your ideas and make improvements to the design if necessary.
Local council and planning condition wording
We use these to double check the target and ensure the wording of our report will satisfy the planning condition.
SAP calculations
This information tells us how you are building your house, which enables us to work out if we can achieve the deduction.
Must have
1. Address
We need to know the location of the building to apply the correct regional climate data to the assessment.
2. Floor plans
We use these to determine the size and internal layout of the building.
3. Elevations
We use these to measure glazing and doors.
4. Section drawings
We use these to measure internal floor to ceiling heights, and ensure we model the shape of the building correctly where there are vaulted ceilings or other complex aspects.
5. Site plan
We use this to determine the orientation of the building and if there is any shelter factor provided by surrounding buildings.
6. Build type
If full spec is unknown, we need to know the type of build (i.e. timber frame, partial fill 150mm cavity, etc) which will allow us to make reasonable assumptions and advise on insulation types/thickness required.
7. Type of ventilation system
The type of ventilation system will affect carbon emissions in the SAP assessment.
8. Type of heating system including control system, emitter type/s
The type of heating system plays a significant role in carbon emissions.
9. Number of light fittings
10. Any secondary heating systems (such as wood burning stove)
Having a secondary system can take some of the burden off the main heating system. If the fuel used for the secondary heating system has a lower carbon intensity, then this can be beneficial to a SAP assessment.
11. Proposals for any renewable technologies which may be used to comply with planning conditions
If you let us know your scope for renewables, and preferred technology, we can add solar PV, air source heat pumps, or other renewable technologies into a SAP assessment, which will reduce/offsetting CO2 emissions where necessary, and help to comply with planning conditions.
12. Version of regulations (2013/2022)
Let us know which version of regulations the building needs to comply with so we can use the correct software to perform the calculation and measure the results against the correct criteria.
Nice to have
1. Build specification for all heat loss areas
This includes build-ups for all wall, floor and roof types which have heated internal space on one side, and unheated space on the other side. We use these to calculate the fabric heat loss of the building.
2. Details including U-values and G-values (if known) of doors and glazing, including any glazed doors and roof lights
We use these to calculate the solar gains and fabric heat loss of the building.
3. Make and model of ventilation system if system 3 or system 4 is proposed
The type and efficiency of ventilation system plays a role in carbon emissions. By providing us with the make and model, we can ensure that the most accurate data is used.
4. Make and model of heating system and any hot water cylinders (if applicable)
By providing us with the make and model, we can ensure that the most accurate data is used which will usually be advantageous over entering ‘default’ systems into the assessment.
5. Wattage and capacity (lm) of light bulbs used
If we don’t have this information, we will complete the assessment based on recommendations, which must then be followed.
6. Details of any renewable technologies including orientation and output (kWp) of any solar PV panels
Knowing the finer details of proposed systems ensures we model the SAP accurately, without making any assumptions about what is or isn’t feasible on-site.
Free downloads
More from us
Make things easier for you and keep it under one roof. Did you know that we offer a wide range of building compliance services?
Take a look