On-site

SmartHTC Checklist — Gold Service

This free checklist is crafted to provide you with all the essential information for preparing your project, to ensure things run smoothly on the day of testing and to give you the best chance of first-time success.

SmartHTC measures the actual heat loss of a building, allowing easy comparison between expected and real-world performance. By identifying true peak heat demand, it supports accurate heat pump sizing and improved system efficiency. The process is non-intrusive, with discreet sensors left in the property for 21 days while normal living continues.

Our Gold option provides a complete, hands-on service where an engineer attends site to install the sensors at the property and returns after the 21-day monitoring period to remove and collect them. This option requires 2 visits to site and no action from the client.

SmartHTC is available for 1–2-bedroom, 3 bedroom, and 4+ bedroom properties, with sensor quantities adjusted to suit the size of the home.

1. Build stage

This service is typically carried out on homes selected for pre- or post-retrofit assessment, or for homeowners wanting to understand the true energy efficiency of their property. It can also be performed on completed new builds as a demonstration of build quality and to verify EPC performance, or to help size-up a heat pump before installing.

2. Time of year

Smart HTC requires at least a 7°C difference between internal and external temperatures. Because of this, the service cannot be carried out reliably during late spring and summer (May–August).

The most accurate results are achieved between October and March, with September and April also suitable depending on weather conditions.

3. Information required

• Full name
• Property address
• Number of occupants
• Property type (e.g. end-terrace house, mid-floor flat, etc.)
• Primary and secondary heating systems
• Boiler make and model
• G.C. number (7-digit Gas Council ID for gas appliances)
• Window frame and glazing type
• Floor plans (if available)

4. Power

The sensors are battery-powered, so nothing needs plugging in.

5. Access

We’ll need access to the whole property to fit the sensors. They must be placed on internal walls, away from radiators and ventilation, so they aren’t affected by hot or cold spots. We’ll also need access again after the 21-day monitoring period to remove them.

6. Parking

We ideally need parking within 20 metres of the property to efficiently carry out the service. Multiple trips may be required back to the vehicle, and having parking allows us to limit time spent setting up the equipment. If no parking can be provided, please notify your relationship manager, as parking charges will be added to the final invoice.

7. Location and site address

We aim to arrive at the designated time window, so to help us be as efficient as we can, let us know if there are any difficulties finding the site. Ideally, send us what3words. For your certification records we will require the registered site address. Please ensure the correct address is used on all correspondence, as changes will incur an additional cost.

8. Peace of mind

We are experienced in dealing with retrofit projects and understand residents may be vulnerable. Therefore, all our engineers are DBS checked and carry photographic ID available on request.

More from us

Make things easier for you and keep it under one roof. Did you know that we offer a wide range of building compliance services?
Take a look

Make sure you check out
ATSPACE

Other checklists

Get started

ATSPACE

Compliance services

Discover more

Established 2008
Google's No. 1 compliance company in the UK, as voted by you.
ATSPACE provides uncomplicated compliance, from design through to completion, for developers, contractors and industry professionals. Our same-day response and one point of contact throughout guarantees FAST Building Regulation sign-off. With our network of engineers across England & Wales, we've got you covered.